Scope:
- Geotechnical Investigation for the control tower. The study included settlement analysis, and it was submitted to the General Authority for Port Said Ports.
- Study Date: 2009.
Client:
- Pacer Consultants.
- Geotechnical Investigation for the control tower. The study included settlement analysis, and it was submitted to the General Authority for Port Said Ports.
- Study Date: 2009.
- Pacer Consultants.