Scope:
- Provided subsurface geotechnical investigation for the proposed project.
- Over 440 meters of borehole drilling.
- Study Date: 2008.
- Provided subsurface geotechnical investigation for the proposed project.
- Over 440 meters of borehole drilling.
- Study Date: 2008.