Scope:
- Geotechnical investigation for the water tank and educational facility.
- Over 100 meters of borehole drilling.
- Study Date: 2014.
- Geotechnical investigation for the water tank and educational facility.
- Over 100 meters of borehole drilling.
- Study Date: 2014.